Use System 3R tooling when producing punches and dies
Gives an increased productivity in the Tool shop by a reduction of the set-up times, improved accuracy & quality and reduced number of rejections.
Use System 3R tooling also in the powder compaction process
Reduces the set-up times in the press and gives an improved
accuracy & quality and less repairs.
Fitting the machines with the same reference system means that electrodes and workpieces can be moved between the machines without subsequent alignment and checking – One Minute Set-up.
- Simple, quick set-up
- High accuracy
- Low scrap rate
- Maximal machine utilization
- Increased productivity
Product Features
Higher productivity, calculation example: | ||
Conventional setting-up | Pallet system | |
Working time per day | 8 | 8 |
Setting-up time per day (hours) | -4 | -0.5 |
Spindle time per day | =4 | =7.5 |
Working days per week | x5 | x5 |
Spindle time per week | =20 | =37.5 |
Faster payback, calculation example: | ||
Conventional setting-up | Pallet system | |
Hourly invoicing (Euro) | 50 | 50 |
Spindle time/week (hours) | x20 |
x37.5 |
Revenue /week (Euro) | =1 000 | =1 875 |
Capital cost of machine (Euro) | 150 000 |
150 000 |
Capital cost pallet system (Euro) | 0 | +10 000 |
Total capital outlay (Euro) | =150 000 | =160 000 |
Paybacktime (weeks) | 150 | 85 |
A reference system minimises setup times
Every minute that can be converted from internal to external setting time increases the spindle time of the machine and with it the productivity of the business.Big earnings are within your reach
The machine generates revenue when its spindle is turning – and only then. Work smarter, not harder.Clients